Produced Water Treatment · ENGINEERED SCOPE

Induced Gas Flotation — IGF Packages

IGF packages remove dispersed oil and suspended solids from produced water by generating fine gas bubbles that attach to contaminants and float them to a controlled skim layer. Upstream oil-droplet preservation and chemical conditioning strongly affect performance.

Induced Gas Flotation — IGF Packages

Engineering approach

Induced Gas Flotation — IGF Packages

A technically defined package begins with the operating envelope—not a catalogue model.

Rated capacity, minimum stable load, feed envelope, inlet and outlet conditions, product specification, start-up and shutdown cases, design life and acceptance criteria are agreed before equipment definition is frozen. Package basis also fixes battery limits, skid envelope, lifting and shipping constraints, utility tie-ins, FAT scope, preservation requirements and commissioning deliverables.

Design basis

Specify flow and turndown, oil-in-water and solids distribution, droplet and particle size, salinity, temperature, gas availability, target outlet quality and downstream discharge or reinjection duty.

Process configuration

The package may use mechanical induction or recycled-gas eductors, multiple flotation cells, chemical injection, inlet conditioning, skimming, sludge or oil collection and produced-gas containment.

Verification focus

Review covers hydraulic retention, gas-to-water ratio, short-circuiting, bubble dispersion, chemical response, skimmer control, gas safety, oil-sludge handling, online monitoring and performance sampling points.

PROJECT DEFINITION · DELIVERY

Clear inputs, auditable outputs

Technical proposal quality depends on verified process data, acceptance criteria and interface definition. The following information is confirmed during clarification.

RFQ information

  • Normal, minimum, start-up and credible upset flow cases
  • Specify flow and turndown, oil-in-water and solids distribution, droplet and particle size, salinity, temperature, gas availability, target outlet quality and downstream discharge or reinjection duty.
  • Site utilities, ambient data, hazardous-area classification and battery limits
  • Required performance guarantee, redundancy and availability philosophy
  • Applicable project codes, materials, inspection requirements and document format

Engineering deliverables

  • Design basis, process description and operating philosophy
  • Heat and material balance, PFDs, P&IDs and utility summary
  • Equipment datasheets, line and instrument lists, control narrative and cause-and-effect inputs
  • Layout, nozzle and interface data, foundation loads and maintainability review
  • Inspection and test plan, FAT documentation, manuals and final manufacturing record

RFQ

Discuss this duty with engineering

Share the operating cases, feed data and required guarantee so the applicable process route, package boundary and verification plan can be defined.

Submit technical request